CR Solar Rep Cheat-Sheet

Co-Create, Over-Communicate, Connect

Installer Marketplace

Markets: IL, MO

Avg. Install Timeline: 4-6 Weeks

2020 Install Volume: Not reported

Markets: AZ, CA, CO, GA, FL, MS, MO, NV, NM, NC, SC, TX, VA, UT

Avg. Install Timeline: 8-10 Weeks

2020 Install Volume: 132,816 kWh

Markets: DC, MD, PA, VA, 

Avg. Install Timeline: 4-7 Weeks

2020 Install Volume: 13,856 kWh

Nationwide

Markets: ID, OR, WA
Avg. Install Timeline: 6-8 Weeks

2020 Install Volume: Not Reported

Copyright 2021 | CR Solar
Copyright 2021 | SolarM.E.